TLC Equatorial Guinea supported a jack-up rig offload for Shelf Drilling.

We are happy to report that TLC Equatorial Guinea recently supported a jack-up rig offload for Shelf Drilling.

In April, TLC EG managed a float-off operation in Luba and successfully assisted in a smooth discharge of the Shelf Drilling’s jack-up rig Scepter.

The HLV sailed on April 14th to its next destination and the assisting tugs used for discharge hooked up the JU Scepter and set off for Nigeria on the 16th of April.

TLC EG is proud to have significantly contributed to this operation, and to have been appointed as the shipping agent in charge of general operation coordination.

 

.